Presumably you'd still end up with the same problem as now, but you'd simply be moving it up stream. So rather than one 40-tonne fatberg in one location, you'd have say 40 1-tonne fatbergs, all of which need individually removing, but which are all in smaller less accessible pipes so harder to work in.