Reply to post: Re: DEC Engineer

Sysadmin shut down server, it went ‘Clunk!’ but the app kept running

Adam Foxton

Re: DEC Engineer

@iamanidiot

Absolutely disagree. Breakers should be labelled with which machine(s) they power, and ideally machines labelled with appropriate breakers too.

At the very least have a map.

Having to know "okay, so it's the second breaker down for the first machine's primary PSU (excluding the red one for the UPS) and fifteenth up on that other switchboard for the secondary PSU, ah, no, wait, fifteenth /single phase/ one" is a recipe for disaster.