It was even more impressive during construction

I was part of the team that produced the original computer based monitoring system (based on a PDP 11/34 with 2 RK05 disks (2.4MBytes each!!)).

To get the main overhead cranes into position, large mobile cranes were used which had about 6 inches of clearance coming down the main access tunnel - the crane driver was superb.