Post: Tukwila chip will be six months later at least
Tukwila chip will be six months later at least →
Posted Friday 16th January 2009 14:32 GMT
In HP gooses virtualization for servers
Tukwila chip will be six months later at least because they could not compete with Nehalem chips. DDR3 will now be added which requires the pins to be changed.
Too bad VMWare does not run on Itanium. HP actually uses charts which says "Integrity Virtual Machine - The "VMWare" for Itanium" what a joke. IVM is a modified HP-UX. The overhead is unreal.
Top stories
Popular Whitepapers
- Systems management simplified
Guided tour: Dell Management Console - Virtualization with the Intel Xeon Processor 5500 Series
A proof of concept - Total cost of ownership of Dell, HP and IBM blade solutions
A comparison conducted by Principled Technologies - A Cure for Server Sprawl
Dell Global Infrastucture Consulting helps DeKalb Medical - Optimizing the data center for cost and efficiency
Control costs and add value to the business - Real-world server consolidation with Hyper-V
35 HP ProLiant DL385 servers onto 5 Dell PowerEdge M610 blade servers running Hyper-V
